Although lockdown has meant that the pool building refurbishment had been delayed with both our teams and suppliers affected so the pool remains closed until the autumn (hopefully September).
However, the project is progressing well again. The main & teaching pool changing village is nearly completed along with the showers and toilets, new pool covers, new pool benches and new glazing to the atrium has been installed.
A new Changing Places Room has been built offering a fully accessible toilet with the right equipment and generous space for the disabled person and up to two carers plus their equipment. The room also includes a shower, a height adjustable sink, hoist and a height adjustable, adult sized changing and shower bed.
Work is continuing in the lagoon changing village and major work in the cafe upstairs.
Click here to read Pool in the Park.